AIA Tampa Bay's profile

R-011 Donnely Condo Renovation

Donnely Condo Renovation

The condominium is on the 15th floor of Siesta Key’s Terrace Building, originally designed in 1969.  Two corner units were combined into a single condo.  All interior partitions were removed.  The ceiling finish was stripped to expose the concrete formwork.  The bathrooms, storage, and kitchen are laid out in a wood-clad central core. The windows were replaced by bi-fold glass doors that open out from the structural corners. 

Ten-foot-wide steel and wood folding partitions allow the owners to transform the space.  The partitions fold back into the wood core to reconnect the private suite with the rest of the unit to form one continuous space.  The master bath borrows light from an adjoining space through a window with a switchable electric film.  Speakers, vents and air return are all accommodated through discrete cuts and perforations in the wood veneer. 

R-011 Donnely Condo Renovation
Published:

R-011 Donnely Condo Renovation

Published:

Creative Fields