Tomar EMIO
1208
102
2
Add to Collection
About

About

The project is a conversion of a former rundown infrastructure. The design maintains the entire external perimeter construction, while its interi… Read More
The project is a conversion of a former rundown infrastructure. The design maintains the entire external perimeter construction, while its interior is totally scooped out. The new construction establishes itself as a new building inside the existing building. Read Less
Published: