Two new bathrooms to fit 1909 home. Complete tile work,paint and new fixtures. Blending period and new styles.
Published:
 THESE TWO BATHS WERE CREATED FROM ONE LARGER ROOM.ALL PLUMBING AND MECHANICAL IS RETROFIT.A WALL WAS ADDED TO CREAT A FULL BATHROOM WITH SHOWER OPENING TO HALLWAYAND A HALF BATH OPENING INTO A GUEST ROOM
 
 
  
LARGE ROOM BEFORE DIVIDER WALL 
SHOWER STALL FRAMING AND PLUMBING  
PAN LINER BEFORE DRY PACK
 WALLS HAVE VINYL BARRIER AND BACKER BOARDFLOORS HAVE BACKER INSTALLED
DRY PACK
SUBWAY TILE GROUT READY
 NICHE DETAIL
CUSTOM CUT PAN TILE INDIVIDUALLY LAIDCURB AND FLOOR IN SAME DARK LIMESTONE
NICKEL FIXTURES
COPPER CURTAIN RAIL
MOULDING AT CEILING
ORIGINAL WOOD WAINSCOATING, WINDOW AND DOOR
THIS NEW HALF BATH SHARES WALL WITH BATH ABOVE
NEW HEX TILE
THIS WALL BUILT OUT TO CREATE HALL LINEN CLOSETDOOR OPENING DELETED
CLOTHES STORAGE ADDED
ACCESS TO ATTIC
FULL ACTION TOTO WASHLETTHIS BATHROOM ENTERED THROUGH GUEST ROOM