Add to Collection
Tools Used
About

About

Provisional and definitive signage systems improving passenger flow impacted by a new liaison building linking two terminals at Aéroport Charles … Read More
Provisional and definitive signage systems improving passenger flow impacted by a new liaison building linking two terminals at Aéroport Charles de Gaulle, Paris. Read Less
Published:
Recent project – Signage: Aéroport de Paris
A multi-phased 18 month project for Aéroport de Paris. A new liaison building connecting the two terminals 2A and 2C was recently opened to increase, speed up and ease passenger flow and management. Changes resulting from the introduction of the new liason building impacted on different zones within the two terminals; including new arrival and connection halls. 
I headed an external team assisting various studios of ADP in the graphics, flow and impact resulting from the ongoing construction and refurbishment of the terminals. Areas of responsibility included analysis, presenting the findings and proposing alternative scenarios and preparation of design files for provisional and permanent signage throughout numerous zones including customs, arrivals, departures, connections and services.