A Re-design of Elharam Street's Water Reservoir
4th Year Architecture Project
4th Year Architecture Project
The idea was to re-design the water tank located in Elharam Street to show a more modern look than it was before. Using the modern elements and textures available we would enliven the current structure as well as introduce a new function to the building - administrative offices, shops or even a cafe.
Each student was free to choose which activity to add or even a mix and match from all three.
The project was given a time frame of two weeks! The below work was done in 6 hours (including the render time of the shots).
Each student was free to choose which activity to add or even a mix and match from all three.
The project was given a time frame of two weeks! The below work was done in 6 hours (including the render time of the shots).
The Main Elevation.
A side shot showing most of the building's details.
A shot showing off the remaining sides of the building.
A side shot.
An over shot for the Main Elevation.