Appointment: Designer Architect
Produced the design and drawings from the outline proposal through to the detailed design
RIBA work stages C, D, E, F, G, K
Design co-ordination with the Structural, Mechanical, Electrical and Public Health Engineers and with the P-Way, Over Head Line, Civils and Rail Engineers
Produced the NBS Construction Specifications
Prepared the CDM Designer Risk Assessment
Submission for planning approval (Compliance to the Building Regulations Scotland)
Provided technical support during the construction stage