Antonis Tzortzis's profile

NEW MYKONOS AIRPORT

NEW MYKONOS AIRPORT

Architectural Design: K-Studio & BETAPLAN
Construction: Intrakat
Client: Fraport Greece


K-Studio Design Team:

Project Director: Dimitris Karampatakis
Senior Project Architect: Antonis Tzortzis
Parametrics: Antonis Tzortzis, Michalis Skitsas
Visualization: Antonis Tzortzis
INSPIRATION
WHITENESS                      CYCLADIC COURTYARDS                    CYCLADIC PEGION HOUSES
        
Below is the video presentation we prepaired as Studiotaf:
Short version video:
Full version video:
Video Production by STUDIOTAF

Video full credits:

Creative Direction: Antonis Tzortzis
Production Coordination: Tonia Tzortzi
Art Direction: Dimitris Karampatakis
Εditing : Constantine Pilavios
Direction of Photography / Drone Shots: Mariana Bisti
Camera Operation: Michalis Richter
Assistant Production Management: Ariadni Kioussi
Technical Support: DK rental house

3d modeling: Studiotaf / Floating House
Texturing: Studiotaf / Floating House
Animation: Studiotaf / Floating House
3D tracking & compositing: frameworks
Graphics: Studiotaf
Color Grading: Dimitris Karteris

Music Composition: Konstantine Pope
Still Frame from the video presentation  © Studiotaf
Still Frame from the video presentation © Studiotaf
NEW MYKONOS AIRPORT
Published:

Project Made For

NEW MYKONOS AIRPORT

The New Mykonos Airport

Published: