District C (Madrid, Spain)

Project: New headquarter of Telefonica at District C
Location: Madrid, Spain
Promotors: Telefónica
Architect: Rafael de La-Hoz
Management: Bovis Lend Lease
Constractor: FCC Construcción / Dragados

Pieces of Alcantara Black® in flamed finish as description and work requirements:

+ 120,200 sqft. of pavers 15x15x6-8 cm. made of AK flamed
+ 2,624.67 ft. ladder with custom footprints of 100x43x3 cm. made of AK flamed
+ 2,691.00 sqft. of ramp made of pieces 100x30x3 cm. in AK flamed
+ 69,965.40 sqft. of pieces for walls made in 100x30x3 cm. AK flamed
+ 1,640.45 ft. staircase of footprint ladder in 100x33x3 cm. made of AK flamed
+ 492.15 ft. of special solid elements for the water channels and the lake made in AK flamed
Here you can see the amazing staircase and ramp which gives access to the corporate zone of the complex. The picture was taken in a foggy day. The pavers, the tiles of the ramp and the special footprints and risers of the staircase was made of Alcantara Black® material.
The same zone in a night shoot. You can observe a close view of the different items of this zone, including the pavers. All the items was made of Alcantara Black® material.
A close detail of one of the many interior corridors between buildings. All of them are lined with Alcantara Black® cobblestones.
Another close detail of this areas near of the amazing central lake. You can appreciate the natural beauty of the landscape that all the Telefonica employees can enjoy.
District C (Madrid, Spain)
Published:

District C (Madrid, Spain)

The complex, which was designed by architect Rafael de la Hoz, is the home office of Telefónica. It sits on a 200,000-m2 lot and can hold 14,000 Read More

Published: