Tomar EMIO
1249
105
2
Published:
  • Add to Collection
  • About

    About

    The project is a conversion of a former rundown infrastructure. The design maintains the entire external perimeter construction, while its interi… Read More
    The project is a conversion of a former rundown infrastructure. The design maintains the entire external perimeter construction, while its interior is totally scooped out. The new construction establishes itself as a new building inside the existing building. Read Less
    Published: