Video Elite's profile

OFO&Minions,Over-long poster for subway station

OFO&Minions,Over-long poster for subway station
Project name/项目名称: OFO&Minions,Over-long poster for subway station
Production team/制作团队:VideoElite Studio
Creative director/创意指导:Rico/刘衡
3D design/三维制作:Rico/刘衡   Kog' Maw/牛原野  Ruby/郑璐 CY/崔耀
Graphic Artist Designer/平面设计:XT/小童
Plane finishing/后期精修:LuoTao Digital Imaging/罗涛数码
Project cycle/项目周期:3D/6Days  Plane finishing/5Days

Project description/项目描述:
It was a bold and tentative project for the VideoElite Studio. The project cycle was very stressful. It took 6 days altogether. We stayed alive for 5 days. As the final inkjet size of the project is very large, it adds  the difficulty to rendering. The final resolution power of the whole large-chart is 127559*8504, actual printing size is 60 m*3 m. It's a very scary rendering. The model was basically completed within 2 days, and the overall efficiency was very high. Finally, we use 11 52-thread machines were rendered. The longest scene was rendered for about 34 hours on the rendering farm. Later refinement is done by Luo Tao, thank them very much for their team. It is said that the  PSD file finally reached dozens of GB. Very dedicated plane finishing team. I was really happy when I saw the effect in the subway! Thanks for all partners' efforts!
这是一次VE团队大胆的尝试性项目。项目周期非常紧张,总共6天时间,我们生熬了5天。由于项目最终的喷绘尺寸非常之大,加重了渲染的难度。整张长图最终的分辨率为127559*8504.实际喷绘尺寸60米长*3米高。可以说是非常恐怖的渲染量。模型基本在2天内全部结束,整体效率非常高。最后在渲染农场开了11台52线程的机器进行渲染。最长的一个场景渲染了34个小时左右。后期精修部分由罗涛完成,非常感谢他们的团队。据说psd最终达到了几十个G。非常敬业的平面精修团队。最终看到地铁里面的效果时确实非常开心!再一次感谢团队的小伙伴们的付出!



Rough sketch of the design



Local details



Blocking scenes


Picture-taking
OFO&Minions,Over-long poster for subway station
Published:

OFO&Minions,Over-long poster for subway station

It was a bold and tentative project for the VideoElite Studio. The project cycle was very stressful. It took 6 days altogether. We stayed alive f Read More

Published: