Top Energy, Northland, NZ
New Depot
New Depot
Borwn & Thomson Northland Ltd
20m span portal frame with 5 tonne gantry crane, 9m wide load out, mezzanine floor independently supported on a steel frame, so partitions could be moved at a later date if required, mezzanine floor joists are pressed metal /timber truss type for services to pass through.
Timber framed offices at the front with timber roof trusses and Gib board bracing.
The whole site is built off 2.0m of engineered compacted fill, crushed blue rock from the local quarry.