Pike River Mine
5321
674
40
Published:
  • Add to Collection
  • Tools Used
  • About

    About

    My design approach follows a linear narrative of the Pike River Mine Explosion. Starting with the first explosion on the 19th of November 2010, a… Read More
    My design approach follows a linear narrative of the Pike River Mine Explosion. Starting with the first explosion on the 19th of November 2010, and ending six days later with the second explosion on the 24th. The story that I have told spans over these six days and is split up into seperate sections for each individual day. Read Less
    Published:


Pike River Mine Explosion  

My design approach follows a linear narrative of the Pike River Mine Explosion. Starting with the first explosion on the 19th of November 2010, and ending six days later with the second explosion on the 24th. The story that I have told spans over these six days and is split up into seperate sections for each individual day.

When it comes to presentation, I decided to leave the binding exposed for a more natural feel. Having it exposed also gives it a nice layering effect that can be translated to what a underground mine abstractly looks like

Fonts used: (Nimbus Sans, Neue Haas, and Freight Pro)

Follow on Instagram or Twitter.
© 2016