Intensive Bridge
Designed with the trainees team original bridge's truss
won first place on the architectural workshop.
The aim of redesign was to obtain a fresh,
emotional design that differs from the bridge's
standard appearance while maintaining the construction correctness.
The aim of redesign was to obtain a fresh,
emotional design that differs from the bridge's
standard appearance while maintaining the construction correctness.