Qatar Cool Videomapping
Qatar Cool Opening 2010
 The Pearl Qatar Videomapping
The worlds’ largest ‘IntegratedDistrict Cooling Plant’ was the stage for a Video-Mapping-Building projectionin celebration of the opening ceremony of the Qatar Cool building. After thefirst part was put to use in September 2006 the build is now completed. The‘Cooling Plant’ has a cooling capacity of 130.000 tons to supplyair-conditioning by means of chilled water distribution to ‘The Pearl Qatar’ with all it´s buildings and 40.000 homes.

In the short run to the event of three weeks the decision was made to create anambitious video mapping on the 50 meters wide and 17 meter high entrance to thebuilding of the ‘Cooling Plant’. Projection was done using 2 Barco XLM-HD30 and2 FLM-HD20 projectors connected to two MacPro 8-core Catalyst media servers anda Wholehog-III light console.

To show the opening ceremony and to record the video mapping scene a BarcoFSN-1400 HD production mixer and 3 Sony HXC-100 HD cameras were used andrecording was done using a PDW-1500 XDCAM-HD recorder.
For lighting thebuilding of 220 x 55 x 35 meters and lighting the gigantic process hall 60Citycolors-2500HMI, 40 Movingheads and 100 LED-strips were used. A full PAsystem for speech and amplification of the sound design accompanying the videomapping.
Qatar Cool Videomapping
2
221
0
Published:

Qatar Cool Videomapping

The worlds’ largest ‘Integrated District Cooling Plant’ was the stage for a Video-Mapping-Building projection in celebration of the opening cerem Read More
2
221
0
Published:

Creative Fields