This project was the complete interior renovation of an existing 7,500 SF single-story building with an a 3,500 SF addition. The building had originally been used as part of an educational complex by the Dept. of Corrections and was closed in 2001. While in disuse, the building became occupied by vagrants and copper thieves, causing considerable damage to the interior of the building. The property was then transferred to BCTC to be used by the GED and ESL programs. The existing building was almost completely gutted and a new configuration for classrooms was added back. A new addition added four additional classrooms and new restrooms.