La reforma y ampliación del edificio de Juzgados de Teruel fue todo un desafío técnico. El edificio en el que se ubican fue reconstruido a mediados del siglo XX tras sufrir  daños importantes durante la guerra. Si bien se trata de un edificio emblemático, la reconstrucción se realizó con materiales humildes collevando, entre otras cosas, una distribución tortuosa y  huecos de luces pequeños para el uso público al que está destinado.

Para ampliarlo, se le sumó una parte abandonada de la edificación anexa. Conseguir una distribución adecuada, ejecutar las obras en condiciones de seguridad mientras se mantenían abiertos los juzgados, garantizar la solidez estructural, solucionar la accesibilidad e integrar las instalaciones modernas en un edifico obsoleto fueron dificultades que se sumaban una a la otra. Fue por tanto necesario realizar un seguimiento concienzudo de la obra.
 
El resultado logra un equilibrio adecuado entre la representatividad que el uso demanda y la funcionalidad, entre la imagen del edificio histórico y las prestaciones de usabilidad y seguridad exigidos hoy en día.
 
El trabajo de consultoría y direccion facultativa se realizó junto con el arquitecto Pedro Ramírez Perea y el arquitecto técnico Pancracio Gómez Molina. La empresa constructora fue BAUEN SA
 
 
 
The enlargement and remodeling  of Teruel Courts  was a technical challenge. The building in which are located was rebuilt in the mid-twentieth century after suffering principal damage during the war. Although it is a landmark building, reconstruction was performed with humble materials so, among other things, it had a tortuous distribution and too small portics for public use that is intended.
 
To enlargement it, was joined to an abandoned annex part. Achieve adequate distribution, carry out works safely while courts remained open, ensure the building structural integrity, solve accessibility and integrate modern facilities in an outdated building were difficulties that were growing time to time. It was therefore needed to implement a thorough monitoring of  site works.
 
The result reaches an appropriate balance between the representativeness as it use demands and functionality, also the image of the historic building and the benefits of usability and security needed today.
 
The consulting and project management was held in conjunction with the architect Pedro Ramirez Perea and the technical architect Pancracio Gómez Molina. Works by BAUEN SA.
 
Initial State
Initial State
Works evolution
Works evolution
project
Final State · New Access
Final State · New Access
Final State · New Access
Final State · New Access and Public area.