Demolition of existing precast plank ramp and replacement with structural concrete elevated slabs. The scope included a new concrete footing and pier, along with existing railing modifications, concrete patching and epoxy traffic coatings. Project total cost $160,000.
![Education construction Commercial Constructio](https://mir-s3-cdn-cf.behance.net/project_modules/disp/d45d4a30079331.5612a8219bcb1.jpg)
![Education construction Commercial Constructio](https://mir-s3-cdn-cf.behance.net/project_modules/disp/111d3830079331.5612a8219ceaa.jpg)
![Education construction Commercial Constructio](https://mir-s3-cdn-cf.behance.net/project_modules/disp/83cc8830079331.5612b6a3bc98c.jpg)
Prior to renovation
![Education construction Commercial Constructio](https://mir-s3-cdn-cf.behance.net/project_modules/disp/30271a30079331.5612b6a3bdb5e.jpg)
Before the renovation
![Education construction Commercial Constructio](https://mir-s3-cdn-cf.behance.net/project_modules/disp/c41b7f30079331.5612b6a3bee84.jpg)
Image of ramp prior to the renovation