Robert Biscoe's profile

Kingaroy State High School-Flying Start Project

North East View-2 levels of teaching spaces over undercroft which links to central courtyard.
Photographer: Anne Langdon Photography
Flexible Learning Area with off form concrete seats and east screen incorporating peanut emblems ( a local crp grown in Kingaroy district)
Photographer: Anne Langdon Photography
PROJECT DESCRIPTION
 
The Kingaroy State High School Year 7 building is part of the Queensland Government Flying Start programme, which introduces year 7 students into state high schools for the first time in 2015. This project is a significant addition to the KSHS Campus and was seen by our practice as an opportunity to design a building that was nurturing for the new young cohort, while integrating it with the existing school.
 
We investigated a range of planning solutions, outside the suggested template design, that met the brief area targets while providing the best passive design solution. We promoted a range of single room thickness, north oriented plans to DETE. Our preferred solution was a “C” shaped plan that offered a feeling of “opportunity and refuge” with the additional benefit of a central courtyard. This court extended the brief to provide an additional external teaching and recreation spaces.
 
This building contains 11 General Learning Areas, a collaborative learning ares, 2 Flexible learning areas, 2 Project development areas, Staff room, amenities and an undercroft. The programme was accommodated in a 3-storey building that was elevated approximately 1 metre above a flood plane. The sub floor space provided opportunity for a rainwater tank farm of 70,000-litre capacity.
 
The building is framed in reinforced concrete with lightweight infill walls. Cladding materials have been chosen for their durability and low maintenance. External walls and roofs are colorbond metal, areas that can be maintained from floor level are clad in painted compressed FC. Our object was to provide a new facility that would have low maintenance costs as state schools have limited maintenance budgets.
The building has a tripartite elevational treatment. The base within the flood zone has a perforated brick screen to allow floodwaters to run below the undercroft. The undercroft and level 1 are strongly framed by the concrete column grid with projecting concrete sun hoods. The lightweight second floor appears to hover over the robust base.
Wide roof overhangs; external screens and sunhoods provide the required sun shading an appropriate climatic solution to facades.
 
 
Vernacular references have been incorporated into the building facades. These include:
1.     Red brick to the sub floor and stair cores, as a reference to the rich red agricultural soil of the area.
2.     Peanut emblems in perforated sunscreens as a reference to the important agricultural crop of the Kingaroy region.
3.     Perforated white metal screens on west facades as a reference to the majestic peanut silos located in the centre of town.
 
The building is extremely good value for money, is environmentally sustainable, and provides an asset to the school and local community.
 
PROJECT TAEM
Architect - Biscoe Wilson Architects
Client - DETE ( Department of Education Training and Employment)
Project Manager - ALTUS Page Kirkland
Structural Engineer - ARUP
Services Engineer - BSI ( Building Services Integration
Landscape Architect - Mackay Design
Photographer - Anne Langdon Photography
 
 
Western sun screens were designd to reference the concrete paenut silos located in teh centre of Kingaroy town
Photographer: Anne Langdon Photography
Kingaroy State High School-Flying Start Project
Published:

Kingaroy State High School-Flying Start Project

The Kingaroy State High School Year 7 building is part of the Queensland Government Flying Start programme, which introduces year 7 students into Read More

Published:

Creative Fields