The design office & production building
This was my 3rd semester project, during the 3rd semester we had to do go through all the detail phases as well as additional architectural, engineering and management parts the program was overloaded so we had to have a well put together planning it was like this because in the second part we had to do additional drawings for the production of prefabricated building. 
 
Production and mounting drawings
The design office & production building
1
29
0
Published:

The design office & production building

# semsa
1
29
0
Published:

Creative Fields