Were given an unleveled base plan assignment in my studio of a condominium complex for which we had to grade and demonstrate swales and drainage throughout, all by using the slope formula. Started out with a hand drafting which then was converted to CAD work and a close up enhancement of the core crown from which the grading started at that branched off from an 850.50' elevation point.