My role on this project was as Art Department Lead and Assistant Camera.
This video was shot within the span of two days and produced in under two weeks through the collective efforts of the crew. While I usually operated the camera with this crew I was tasked with helping build and acquire set pieces and props. While on set I helped with set dressing and assisted the camera operator when needed.