At the end of this mega project, SCCT – Only terminal in Egypt ready to handle 2 mega vessels at the same time.
STS Heightening
In cooperation with two global giants:
- ZPMC (Crane Manufacturer).
- Sarens (heavy lift, engineered transport).
STS Heightening
Publicado em:

Proprietário

STS Heightening

Long-term project (one year). Megaproject with USD 60m investments, 6 of SCCT’s existing STS (Ship to Shore) Cranes was heightened to the require Ver mais

Publicado em: