Showcase & Discover Creative Work Sign Up For Free
Hiring Talent? Post a Job

Bēhance

Signage Project: Aéroport de Paris

  • 414
  • 10
  • 0
  • Current work – Signage: Aéroport de Paris
    Charles de Gaulle Terminal 2 
  • A multi-phased 18 month project for Aéroport de Paris. A new liaison building connecting the two terminals 2A and 2C was recently opened to help the efficient passenger flow and management. Changes resulting from the introduction of the new liason building impacted on different zones within the two terminals; including new arrival and connection halls. 
    Heading an external team assisting ADP ateliers in the graphics, flow and impact resulting from the ongoing construction and refurbishment of the terminals, my areas of responsibility included provisional and permanent signage throughout numerous zones including customs, arrivals, departures, connections and services.