Rear frame chopped.
Frame detabbed, rear hoop welded on.
Gas tank surgery.  Pounded out some dents.  Once the rust has been treated I'll weld in the fuel level sight and weld it all back together.
The start of a rear rack. 1/2" steel tube getting measured and cut.
Bent up and ready for notching.
Spot welded for now, waiting on a new TIG torch.
How it'll sit on the frame.  So far so good.
KZ400 Scrambler
Published:

KZ400 Scrambler

A good friend of mine decided that he wants to learn to ride and asked me to help him find a first bike. I found a 1978 KZ400 for a steal of a de Read More

Published: