Showcase & Discover Creative Work Sign Up For Free
Hiring Talent? Post a Job

Bēhance

Jazan and Hael Universities

  • 149
  • 0
  • 0
  • Jazan and Hael Universities
    Saudi Arabia
  • CC had prepared full design and construction documents for the following:

    1.IT passive infrastructure for four colleges in the university (Engineering and Science in Both universities). 2.Vertical and horizontal backbones. 3.Colleges connectivity with university main data and telecommunication centers. 4.Low current systems (e.g. VOIP, CCTV, card access, BMS, …etc)