"These Generation-1 machines were designed to be built quickly and easily using zero tooling and some carried over components, and many of the surfaces are planar. The result is a stealthy and brutal aesthetic that is 100% driven by function - very Dieter Rams!" Gary Major - Director of Industrial Design, LiuGong
Initial sketch concept created by Gary Major . . . this was the start-point for our 3D development. Image reproduced with permission.
Some high-level project statistics for reference:
Very short gestation period: 29/04-10/05 (10 working days)
7 Alias iterations completed & actively circulated amongst stakeholders to refine concept and finalise details.
206 emails exchanged.
Stakeholder alignment: 2.5 hours spent screen-share reviewing CAD iterations to ensure Client 100% happy & fully in the loop.
vRED worked into development script on a daily basis: to test appearance and ergo in VR, prove out sight-lines & blind-spots via shadow plots, and provide higher quality WIP images to summarise design intent.
75.5 hours Industrial Design time in total.